Trimaran project is intended to showcase multihull news with a focus on racing, build projects, launchings, interesting ideas past and present and also updates on my own trimaran projects. Lots of content and updates to come so keep checking back.
Showing posts with label multihull designer interviews. Show all posts
Showing posts with label multihull designer interviews. Show all posts
Tuesday, 14 October 2014
Friday, 18 October 2013
Saturday, 7 September 2013
Interview with Wayne Barrett in regards to his new trimaran design for home or custom construction the M80
Wayne Barrett has entered the trimaran design market previously with his excellent 24' MOJO trimaran a spiritual successor to the Crowther Buccaneer 24. His new foray into design is called the M80 a folding trimaran design constructed in developed plywood flat panels. I thought I'd contact Wayne and get the low down on his new design.
Trimaran Project Wayne what was the inspiration behind the new design and what requirements is it designed to cater for?
Wayne Barrett After years of building high performance multihulls on a professional level I know very well the huge amount of hours that they consume. With up to sixteen people working full time for months on one project alone you can then gain some idea of how quickly time passes and always to the best estimates time wins.
Thoughts started rumbling to build a boat of my own being at the wrong end of the age scale there is no time to be delving into the high tech process. This is where the original MOJO was initiated purely for my own use and most importantly a boat that I could comfortably and safely handle on my own. Seemingly the boat that suited me was not for the majority, after studying the feedback from MOJO I decided to draw up the M80.
The M 80 had to be more convenient than MOJO so the folding system was included in the design, a standard accommodation layout was adopted with greater flexibility than the split accommodation of the center cockpit. To cut to your question the M80 is for the sailor who has the time and desire to build his own Trimaran that can be easily assembled within a reasonable period of time.
Trimaran Project How would you rate the construction of the new design in terms of difficulty? Is it a project a handyman who has no prior boatbuilding experience but is equipped with some basic skills could take on with a high probability of success?
Wayne Barrett The construction or assembly as I prefer to call it is possibly the most basic one can achieve and still provide a good looking tri. If the builder uses the DXF files and has all the parts cut the process is very quick, Finished parts will appear in no time and the enjoyment of self-building will be sent on a new high. With the advent of CNC every small component is accurately precut, eliminating the risk of incorrect measurements. Even the building frame is precut slotting together in the egg crate principal, I have included the float frames within the same assembly as the main hull thus reducing time even more. Any handyman can put together the M 80 and achieve a high standard of finish.
Trimaran Project Trailerability seems to be the new essential does your set of plans include plans for a trailer as well? Or can a generic boat trailer with minor modification be used?
Wayne Barrett At this stage the plans for a trailer are not included, the majority of standard trailers available can be modified to suit.
Trimaran Project There are a lot of variables I know but what are your thoughts as to an approximate costing to build the boat from scratch?
Wayne Barrett Yes the variables are hard to contend with but my best estimates the cost will be around $45 - $50K. maybe a diligent and resourceful builder could build it for less On the other hand with upmarket deck gear, sails, electronics etc. the cost if not watched could skyrocket, this of course is true with any purchase being a boat, a house, car etc.
Trimaran Project Will the boat be available as a precut kit?
Wayne Barrett Yes as mentioned above it is available in a precut version and in my opinion the best way to build, everything is supplied in the plywood kit, with small items like flanges for the deck hatches, Ring frames for some bulkheads, flanges to support the windows, surrounds for the drop boards and the drop boards. There are 35 2440 x 1220 x 9mm. sheets of plywood involved plus a dozen sheets of 16 mm. cheap ply or chipboard for the building frames.
Trimaran Project How does the folding system work? Is it similar to a Farrier system?
Wayne Barrett Yes it employs the same folding principal.
Trimaran Project Grey area I know but what sort of performance do you envision for the boat if built and sailed light?
Wayne Barrett Never have intentions of being the first boat home (or the last) the M80 has a modest rig with a mast height of 10.4 mtr. M 80 sports a self-tacking jib, a prodder can be set of the bow, Which I have drawn at one meter, so quite conservative, I think she will move along quite nicely, the main hull has a reasonable lwl ratio, the floats are very buoyant and the beams Have excellent clearance. The dagger board is quite high aspect with the rudder having plenty of area for control in the light
You can contact Wayne for more details through the contact us form on www.trimarankit.com a website will be up for the new M80 design soon.
Trimaran Project Wayne what was the inspiration behind the new design and what requirements is it designed to cater for?
Wayne Barrett After years of building high performance multihulls on a professional level I know very well the huge amount of hours that they consume. With up to sixteen people working full time for months on one project alone you can then gain some idea of how quickly time passes and always to the best estimates time wins.
Thoughts started rumbling to build a boat of my own being at the wrong end of the age scale there is no time to be delving into the high tech process. This is where the original MOJO was initiated purely for my own use and most importantly a boat that I could comfortably and safely handle on my own. Seemingly the boat that suited me was not for the majority, after studying the feedback from MOJO I decided to draw up the M80.
The M 80 had to be more convenient than MOJO so the folding system was included in the design, a standard accommodation layout was adopted with greater flexibility than the split accommodation of the center cockpit. To cut to your question the M80 is for the sailor who has the time and desire to build his own Trimaran that can be easily assembled within a reasonable period of time.
![]() |
| M80 trimaran, courtesy of Wayne Barrett |
Wayne Barrett The construction or assembly as I prefer to call it is possibly the most basic one can achieve and still provide a good looking tri. If the builder uses the DXF files and has all the parts cut the process is very quick, Finished parts will appear in no time and the enjoyment of self-building will be sent on a new high. With the advent of CNC every small component is accurately precut, eliminating the risk of incorrect measurements. Even the building frame is precut slotting together in the egg crate principal, I have included the float frames within the same assembly as the main hull thus reducing time even more. Any handyman can put together the M 80 and achieve a high standard of finish.
Trimaran Project Trailerability seems to be the new essential does your set of plans include plans for a trailer as well? Or can a generic boat trailer with minor modification be used?
Wayne Barrett At this stage the plans for a trailer are not included, the majority of standard trailers available can be modified to suit.
Trimaran Project There are a lot of variables I know but what are your thoughts as to an approximate costing to build the boat from scratch?
Wayne Barrett Yes the variables are hard to contend with but my best estimates the cost will be around $45 - $50K. maybe a diligent and resourceful builder could build it for less On the other hand with upmarket deck gear, sails, electronics etc. the cost if not watched could skyrocket, this of course is true with any purchase being a boat, a house, car etc.
Trimaran Project Will the boat be available as a precut kit?
Wayne Barrett Yes as mentioned above it is available in a precut version and in my opinion the best way to build, everything is supplied in the plywood kit, with small items like flanges for the deck hatches, Ring frames for some bulkheads, flanges to support the windows, surrounds for the drop boards and the drop boards. There are 35 2440 x 1220 x 9mm. sheets of plywood involved plus a dozen sheets of 16 mm. cheap ply or chipboard for the building frames.
Trimaran Project How does the folding system work? Is it similar to a Farrier system?
Wayne Barrett Yes it employs the same folding principal.
Trimaran Project Grey area I know but what sort of performance do you envision for the boat if built and sailed light?
Wayne Barrett Never have intentions of being the first boat home (or the last) the M80 has a modest rig with a mast height of 10.4 mtr. M 80 sports a self-tacking jib, a prodder can be set of the bow, Which I have drawn at one meter, so quite conservative, I think she will move along quite nicely, the main hull has a reasonable lwl ratio, the floats are very buoyant and the beams Have excellent clearance. The dagger board is quite high aspect with the rudder having plenty of area for control in the light
You can contact Wayne for more details through the contact us form on www.trimarankit.com a website will be up for the new M80 design soon.
![]() |
| M80 trimaran design, render courtesy Wayne Barrett |
Thursday, 17 January 2013
America's Cup news, Mike Drummond interview part 2
Part 2 of the Mike Drummond interview:
from the following Sail-World article
http://www.sail-world.com/Australia/Americas-Cup:-Designer-Mike-Drummond-looks-at-foiling-and-pitchpoling/105592
Mike Drummond has been involved in the design side of four winning America's Cup campaigns, starting with then Team New Zealand in 1987-2003, before joining Alinghi in 2007 and latterly was the Design Director for Oracle Racing in the 2010 America's Cup, and the development of the wingsailed 120ft trimaran USA-17.
In this second part of the interview (click here to read Part 1) the issues of foiling and the trade-offs are discussed, along with the factors that led to the pitchpoling of Oracle's USA-17, and what is expected to be seen in the second generation of AC72 catamarans.
read more here
from the following Sail-World article
http://www.sail-world.com/Australia/Americas-Cup:-Designer-Mike-Drummond-looks-at-foiling-and-pitchpoling/105592
Mike Drummond has been involved in the design side of four winning America's Cup campaigns, starting with then Team New Zealand in 1987-2003, before joining Alinghi in 2007 and latterly was the Design Director for Oracle Racing in the 2010 America's Cup, and the development of the wingsailed 120ft trimaran USA-17.
In this second part of the interview (click here to read Part 1) the issues of foiling and the trade-offs are discussed, along with the factors that led to the pitchpoling of Oracle's USA-17, and what is expected to be seen in the second generation of AC72 catamarans.
read more here
Monday, 7 January 2013
Boatsmith in Florida building a 48' Arika Wharram catamaran interview with James Wharram and Hanneke Boon
An interesting interview with James Wharram and Hanneke Boon on their design philosophy and on the currently under construction Ariki 48' foam sandwich catamaran which includes some discussion on James Wharram's early designs and making the first transatlantic crossing on a multihull.
http://www.boatsmithfl.com/a-conversation-with-james-wharram-and-hanneke-boon
http://www.boatsmithfl.com/a-conversation-with-james-wharram-and-hanneke-boon
Monday, 17 December 2012
America's Cup updates, ETNZ and Luna Rossa
More updates from Sail-World
From the following article
America's Cup: Emirates Team NZ design chief looks to the second AC72
In a video interview, Emirates Team New Zealand's Technical Director, Nick Holroyd outlines the changes he expects to be made to the team's second AC72, on Day 30, as New Zealand is decommissioned and packed away.
Reading between the lines in this video interview with Sail-World's America's Cup Editor, Richard Gladwell, it is reasonably plain that New Zealand, the team's first AC72 was always something of a design and test platform, and the team's next AC72 will be the real race thing. But even so it is somewhat hard to believe that the fastest boat that has never raced, will be put into mothballs after just 30 days use.
read more here
and the video:
America's Cup: End of the sailing road for the first AC72
On Thursday the Emirates Team NZ shore crew began to decommission the yacht while the team concentrates on finishing Boat 2.
Winch drums and some hardware will be removed from the yacht and fitted to Boat 2.
Boat 1 will be refitted in the near future and held in reserve, to be commissioned quickly in the event it’s needed.
Components for the new boat are being built at Auckland companies Cookson Boats and Southern Spars. The second wing is being assembled now at the team’s Viaduct Harbour base. Hulls, beams and other parts of the platform will be delivered to the base early in January for a launch in early February.
read more here
America's Cup: Old photo evokes design assistance claims
The off the water pressure in the 34th America's Cup, clicked up a few notches today with an attack on the Emirates Team NZ and Luna Rossa co-operation agreement, which has already been the subject of one ruling by the International Jury.
The text, published on a major US sailing website, and elsewhere on the interweb, ran under photo of Emirates Team NZ's Wing Design Coordinator, Steve Wilson, pictured on board Luna Rossa's AC72, with the comment that Wilson was 'obviously helping them with a rigging issue. Two separate teams? Yeah, right.'
read more here
From the following article
America's Cup: Emirates Team NZ design chief looks to the second AC72
In a video interview, Emirates Team New Zealand's Technical Director, Nick Holroyd outlines the changes he expects to be made to the team's second AC72, on Day 30, as New Zealand is decommissioned and packed away.
Reading between the lines in this video interview with Sail-World's America's Cup Editor, Richard Gladwell, it is reasonably plain that New Zealand, the team's first AC72 was always something of a design and test platform, and the team's next AC72 will be the real race thing. But even so it is somewhat hard to believe that the fastest boat that has never raced, will be put into mothballs after just 30 days use.
read more here
and the video:
America's Cup: End of the sailing road for the first AC72
On Thursday the Emirates Team NZ shore crew began to decommission the yacht while the team concentrates on finishing Boat 2.
Winch drums and some hardware will be removed from the yacht and fitted to Boat 2.
Boat 1 will be refitted in the near future and held in reserve, to be commissioned quickly in the event it’s needed.
Components for the new boat are being built at Auckland companies Cookson Boats and Southern Spars. The second wing is being assembled now at the team’s Viaduct Harbour base. Hulls, beams and other parts of the platform will be delivered to the base early in January for a launch in early February.
read more here
America's Cup: Old photo evokes design assistance claims
The off the water pressure in the 34th America's Cup, clicked up a few notches today with an attack on the Emirates Team NZ and Luna Rossa co-operation agreement, which has already been the subject of one ruling by the International Jury.
The text, published on a major US sailing website, and elsewhere on the interweb, ran under photo of Emirates Team NZ's Wing Design Coordinator, Steve Wilson, pictured on board Luna Rossa's AC72, with the comment that Wilson was 'obviously helping them with a rigging issue. Two separate teams? Yeah, right.'
read more here
Tuesday, 20 November 2012
Catsailing News interview with multihull designer Mike Drummond
Interview from the excellent Catsailing News blog
http://www.catsailingnews.com/2012/11/the-racing-designer-mike-drummond.html
There is a special breed of designers/engineers that also know how to race, and specially Multis. That group involves some renowned personalities like Pete Melvin, Fischer and Mike Drummond. Having some of these guys reading the blog like Martin & Mike it is really a privilege and an awkward feeling for me as an amateur, more when I receive feedback or corrections from them, but of course I take advantage and fireback some technical questions too!
read more
http://www.catsailingnews.com/2012/11/the-racing-designer-mike-drummond.html
There is a special breed of designers/engineers that also know how to race, and specially Multis. That group involves some renowned personalities like Pete Melvin, Fischer and Mike Drummond. Having some of these guys reading the blog like Martin & Mike it is really a privilege and an awkward feeling for me as an amateur, more when I receive feedback or corrections from them, but of course I take advantage and fireback some technical questions too!
read more
Monday, 12 November 2012
Interview of proa designer Russell Brown by John Harris of Chesapeake Light Craft
Repost from the excellent blog of John Harris
Russell Brown designed and built his first proa---a multihull sailboat with one big hull and one little hull---as a teenager in the 1970's and promptly went to sea in it, cruising the US East Coast and the Caribbean. Adventures ensued. In the decades since, between stints as a professional boatbuilder with a specialty in ultralight racing boats, he's designed and built several more proas.
John Harris has put up this interesting interview with Russell Brown on the Chesapeake Light Craft website.
Wednesday, 31 October 2012
More build blogs, interviews and info on trimaran construction
Construction of a Dick Newick Val III trimaran (in French)
http://valiii.over-blog.com/
Strike 15 off the beach trimaran by Richard Woods
http://sailingcatamarans.com/Strike%2015.htm
Wavelength 780 trimaran interview with designer Bob Forster
http://smalltrimarans.com/blog/?p=3211
http://valiii.over-blog.com/
Strike 15 off the beach trimaran by Richard Woods
http://sailingcatamarans.com/Strike%2015.htm
Wavelength 780 trimaran interview with designer Bob Forster
http://smalltrimarans.com/blog/?p=3211
Tuesday, 30 October 2012
Steven Callahan interviews with multihull designers for Proboat magazine
A series of impressive interviews by Steven Callahan with a range of designers some exclusive multihull designers and others a portfolio of both multi and mono design.
Nigel Irens February 2000
Adrian Thompson December 2000
Morrelli and Melvin August 2001
Jim Antrim April 2002
Gold Coast Yachts April 2010
Dick Newick December 2010
Nigel Irens February 2000
Adrian Thompson December 2000
Morrelli and Melvin August 2001
Jim Antrim April 2002
Gold Coast Yachts April 2010
Dick Newick December 2010
Subscribe to:
Posts (Atom)


