The first F-22 production trimarans are leaving the Farrier Marine factory. A complete F-22 trimaran and trailer can be packed into a single 40' container. More details here in the May 1st entry:
http://www.f-boat.com/pages/News4/FM-Factory2014.html
The F-33 trimarans that have been constructed in the Multihulls Direct facility in the Phillipines are also being delivered now. These are a custom/semi production design and in this case built to a kit stage for the final fitout to be carried out by the owner, the finish looks excellent.
more detail and photos here:
http://www.f-boat.com/pages/News4/F-33Update1.html
Trimaran project is intended to showcase multihull news with a focus on racing, build projects, launchings, interesting ideas past and present and also updates on my own trimaran projects. Lots of content and updates to come so keep checking back.
Showing posts with label F-22 trimaran. Show all posts
Showing posts with label F-22 trimaran. Show all posts
Friday, 2 May 2014
The first production F-22 trimaran designs shipping from Farrier Marine and F-33 trimarans from Multihulls direct being delivered
Friday, 28 February 2014
Farrier F-22 production trimaran update of Specifications list
Ian Farrier of Farrier Marine has updated the Specifications list for the F-22 trimaran on f-boat.com
http://www.f-boat.com/F-22Specs/index.html
http://www.f-boat.com/F-22Specs/index.html
![]() |
Farrier F-22 trimaran sailing, photo courtesy Farrier Marine |
Monday, 20 January 2014
Farrier F-22 production trimaran update, Hulls #2 and #3 assembled and approaching completion.
More progress noted by Ian Farrier of Farrier Marine on the production version of the Farrier F-22 trimaran.
Factory view as of today. Boats #2 and #3 are now full assembled with floats, while the trailer for #2
is nearing completion. Prototype (#1 on trailer at left) is undergoing some improvements in the wing
net area and is about to have its wheels changed as part of the development process. The new wheels
and tires will lower the trailering height by another 25mm (1") plus have a much higher load carrying
capacity to more than cover any heavily overloaded boats.
You can read the full production blog here:
http://www.f-boat.com/pages/News4/FM-Factory2014.html
Factory view as of today. Boats #2 and #3 are now full assembled with floats, while the trailer for #2
is nearing completion. Prototype (#1 on trailer at left) is undergoing some improvements in the wing
net area and is about to have its wheels changed as part of the development process. The new wheels
and tires will lower the trailering height by another 25mm (1") plus have a much higher load carrying
capacity to more than cover any heavily overloaded boats.
You can read the full production blog here:
http://www.f-boat.com/pages/News4/FM-Factory2014.html
![]() |
F-22 trimarans hull #2 and #3 assembled and approaching completion, photo courtesy Farrier Marine |
Sunday, 12 January 2014
Farrier F-22 trimaran update, shipshape once more at the Farrier Marine factory and more progress towards production
From the following entry on the Farrier Marine website:
http://www.f-boat.com/pages/News4/FM-Factory2014.html
Progress continues, and we are finally getting factory back into shipshape condition now that the earthquake repair workers have gone. All staff members will also be back from their annual summer holidays next week, which will finally get us back up to full speed. Hulls #2 and #3 are getting closer to shipping, and #2's trailer (with optional stainless disk brakes) is nearing completion in the foreground, photo being taken this weekend.
Everything still feels like a snail's pace however, even to me, but to get a high production level one has to be patient, develop every aspect properly, in minute detail, and then fully document so as to ensure it is easily buildable and repeatable. We are not just copying an old design or using old technology, but developing something truly new in every aspect - just like the original F-27 in fact.
read more here
http://www.f-boat.com/pages/News4/FM-Factory2014.html
Progress continues, and we are finally getting factory back into shipshape condition now that the earthquake repair workers have gone. All staff members will also be back from their annual summer holidays next week, which will finally get us back up to full speed. Hulls #2 and #3 are getting closer to shipping, and #2's trailer (with optional stainless disk brakes) is nearing completion in the foreground, photo being taken this weekend.
Everything still feels like a snail's pace however, even to me, but to get a high production level one has to be patient, develop every aspect properly, in minute detail, and then fully document so as to ensure it is easily buildable and repeatable. We are not just copying an old design or using old technology, but developing something truly new in every aspect - just like the original F-27 in fact.
read more here
![]() |
Farrier Marine factory, photo courtesy Farrier Marine |
Thursday, 2 January 2014
Farrier F-22 production update, refinements to pop top and a variety of other details in the recent update
Ian Farrier has posted another update on the production F-22 page. The recent work seems to have focused on the pop top and it's mechanism, mast raising brackets and trailer. It's all looking very polished as we have come to expect from Farrier Marine.
You can read the full update here:
http://www.f-boat.com/pages/News4/FM-Factory2013.html
You can read the full update here:
http://www.f-boat.com/pages/News4/FM-Factory2013.html
![]() |
prototype production F-22 trimaran, photo courtesy Farrier Marine |
Wednesday, 25 September 2013
Farrier F-22 production trimaran, more updates on refinements and boat out for second sail
Ian Farrier has posted some more photos of the production F-22 trimaran in the water for the second sail.
More details on the production log at f-boat.com
http://www.f-boat.com/pages/News4/FM-Factory2013.html
More details on the production log at f-boat.com
http://www.f-boat.com/pages/News4/FM-Factory2013.html
![]() |
F-22 unfolded at the dock ready for second sail, photo courtesy Farrier Marine |
Monday, 16 September 2013
Farrier F-22 production trimaran, video of first test sail on f-boat.com
You can see the video at the following link on f-boat.com
http://www.f-boat.com/videos/F-22FirstVideo.mp4
http://www.f-boat.com/videos/F-22FirstVideo.mp4
Monday, 9 September 2013
Farrier F-22 production trimaran, more reflections from Ian Farrier on first test sail
Ian Farrier has added a bit more detail on the first sail of the new production F-22 trimaran.
http://www.f-boat.com/pages/News4/FM-Factory2013.html
http://www.f-boat.com/pages/News4/FM-Factory2013.html
![]() |
F-22 trimaran launched, new composite trailer in foreground. Photo courtesy Farrier Marine |
Saturday, 7 September 2013
Farrier F-22 trimaran, production F-22 hull #1 goes for it's first test sail
From Ian Farrier of Farrier Marine on the launching:
"After over 12 years of thinking about it, 6 years in development, the all new production F-22 is finally launched. It sailed and handled beautifully, with everything working as expected."
more to be posted on the production blog in the next few days.
http://www.f-boat.com/pages/News4/FM-Factory2013.html
"After over 12 years of thinking about it, 6 years in development, the all new production F-22 is finally launched. It sailed and handled beautifully, with everything working as expected."
more to be posted on the production blog in the next few days.
http://www.f-boat.com/pages/News4/FM-Factory2013.html
![]() |
F-22 hull #1 out for it's first sail, photo courtesy Farrier Marine |
![]() |
Launched at the dock, photo courtesy Farrier Marine |
Friday, 6 September 2013
Farrier F-22 trimaran, Hull #1 ready to sail but conditions not cooperative for launching on first attempt
Hull #1 of the new F-22 production trimaran is ready to sail but when they arrived at the ramp conditions were not safe or conducive to launching the new boat with a strong onshore breeze and no breakwater they retreated to try another day so no sailing report as yet.
You can read the latest entry on Ian Farrier's production progress blog here:
http://www.f-boat.com/pages/News4/FM-Factory2013.html
You can read the latest entry on Ian Farrier's production progress blog here:
http://www.f-boat.com/pages/News4/FM-Factory2013.html
![]() |
New F-22 trimaran on trailer and ready for launching, photo courtesy Farrier Marine |
Friday, 30 August 2013
F-22 trimaran production update, close to splashdown
Ian Farrier has updated his F-22 production blog. The recent updates show the trimaran on the trailer with mast up and sails hoisted.
read the latest update to the blog here:
http://www.f-boat.com/pages/News4/FM-Factory2013.html
read the latest update to the blog here:
http://www.f-boat.com/pages/News4/FM-Factory2013.html
![]() |
F-22 trimaran mast up and sails hoisted, photo courtesy Farrier Marine |
Sunday, 18 August 2013
Farrier F-22 production trimaran update, more on trailer and sails
Ian Farrier has updated his work log on the production version of the F-22 trimaran. This update shows the innovative trailer that is being put together specifically for the F-22 in more detail and some photos of the sails under construction at Doyle's Auckland, NZ loft.
http://www.f-boat.com/pages/News4/FM-Factory2013.html
http://www.f-boat.com/pages/News4/FM-Factory2013.html
Friday, 16 August 2013
Farrier F-22 production trimaran update, more on the trailer and assembly of Hull #1
Ian Farrier has posted another update on the production F-22 trimaran. In the latest update we see the assembled trailer and more finishing touches being added to Hull #1.
http://www.f-boat.com/pages/News4/FM-Factory2013.html
http://www.f-boat.com/pages/News4/FM-Factory2013.html
![]() |
The assembled F-22 trailer with composite insert, photo courtesy Farrier Marine |
Tuesday, 23 July 2013
Farrier F-22 trimaran production update 23/7/2013
Ian Farrier of Farrier Marine has updated his F-22 production blog, Further progress towards completion of hull #1 and some very interesting photos of the new trailer that is being developed for the boat. Frame rails are of anodized aluminium with a molded composite cradle for the boat itself. Innovative and looks like a step forward for multihull trailers.
Read more at the link below.
http://www.f-boat.com/pages/News4/FM-Factory2013.html
Read more at the link below.
http://www.f-boat.com/pages/News4/FM-Factory2013.html
![]() |
Farrier Marine preparing for F-22 production, photo courtesy Farrier Marine |
Saturday, 18 May 2013
Farrier F-22 production trimaran update, F-22 no.1 nearly complete
Ian Farrier has posted an update on f-boat.com that shows the new production F-22 trimaran in a nearly complete state, looks great and only a mast and trailer required to complete.
read the whole production blog here:
http://www.f-boat.com/pages/News4/FM-Factory2013.html
read the whole production blog here:
http://www.f-boat.com/pages/News4/FM-Factory2013.html
![]() |
Farrier F-22 trimaran nearly complete, photo courtesy Farrier Marine |
Wednesday, 17 April 2013
Farrier F-22 trimaran production update, final fitout of main hull proceeding
A new update on recent progress towards completion of the F-22 production trimaran has been uploaded. Final fitout of production hull # 1 is under way.
read the whole production blog here:
http://www.f-boat.com/pages/News4/FM-Factory2013.html
read the whole production blog here:
http://www.f-boat.com/pages/News4/FM-Factory2013.html
Tuesday, 2 April 2013
F-22 production trimaran update, third deck now being infused
Ian Farrier and the crew over at Farrier Marine continue to make progress towards making the F-22 production trimaran a reality. This new craft includes a very interesting array of features including composite chainplates and a carbon mast.
Read all of the production updates and see the latest photos at http://www.f-boat.com/pages/News4/FM-Factory2013.html
Read all of the production updates and see the latest photos at http://www.f-boat.com/pages/News4/FM-Factory2013.html
Tuesday, 19 March 2013
F-22 Trimaran production progress update
The F-22 production trimaran is moving closer to reality with the recent update showing the beams mounted to the float and some additional float and hatch detail. It's all looking slick and well executed as you would expect of an F-boat
read the whole production log here:
http://www.f-boat.com/pages/News4/FM-Factory2013.html
read the whole production log here:
http://www.f-boat.com/pages/News4/FM-Factory2013.html
Wednesday, 27 February 2013
Farrier F-22 trimaran production update
The F-22 trimaran has taken another step towards full production and the Farrier production team are now infusing the deck and hull of F-22 hull no.2, they have also tested the initial carbon mast to destruction which has apparently yielded lots of useful information.
read the whole factory production blog here
http://www.f-boat.com/pages/News4/FM-Factory2013.html
read the whole factory production blog here
http://www.f-boat.com/pages/News4/FM-Factory2013.html
Thursday, 14 February 2013
Farrier F-22 trimaran production update, carbon mast and hull #2
Ian Farrier has updated the Farrier Marine website f-boat.com with some more production photos and an update on their current progress. In this update we see the newly constructed carbon mast which has a gelcoat finish and very neat integrated composite hounds and hull #2 being setup in the mold in preperation for infusion.
See all the updates here:
http://www.f-boat.com/pages/News4/FM-Factory2013.html
See all the updates here:
http://www.f-boat.com/pages/News4/FM-Factory2013.html
Subscribe to:
Posts (Atom)